Week roundup · Wed Oct 29 – Thu Nov 5, 2026 (CT)
What we shipped this week
The Closer →House hub
Termy X · Reply Guy panel
- Fetch posts fixed: Treg was called with the wrong URL form (404 shown as “no posts yet”). Now calls by tool id; live search returned posts; real errors show as “Fetch failed”.
- Text boxes work: type, select, Ctrl+A, Backspace/Delete, paste across the X panel (
9d34ce36).
- Saved Treg key is read back. Paste saves right away. Key field stays short on ultrawide.
- Full panel redesign (
4e3790b3), then a calmer pass: neutral text, one blue action (Fetch / Quote on X), cyan only while loading (5bfe517c). Pushed to reply-guy.
- Quit no longer nags when only Grok/agent panes are busy. Desktop shortcut fixed (it pointed at an old exe).
Termy X · engine
- Merged upstream Termy v1.0.0-rc.10 into Termy X, and landed compose/attach/CI on top (Nov 4).
Calc sites · SEO
- Oct 27 page batch checked live on Nov 3 (200 + in sitemap): generator, welding, battery, chicken ×2, trailer ×2, aquarium.
- First weekly Search Console digest across 9 sites (Nov 2): impressions 963 vs 887 the week before. Biggest gain: hvac-load-calc +101.
- Started an AI-citation baseline log, and wrote the Nov 3 page briefs.
- Pinterest: published URL lists show 12 pins each on Oct 29, Oct 30, Nov 1, Nov 2, Nov 4, and Nov 5. Oct 31 and Nov 3 have no published URLs. An earlier line called the Oct 29, Oct 30, and Nov 2 batches drafts only; those three dates are published. Examples: Oct 29, Oct 30, Nov 2. List: Oct 26–Nov 7 source notes.
Career
- Built an Informatica PowerCenter Administrator resume (HTML/PDF/DOCX) from every prior version. It's a draft for review. More on the background: The Closer.
Daily
- First Love quote cards, every day Oct 29 – Nov 5.