The cover letter is part of this packet — Foundry/AIP, oils ERP, Demantra award, Horizon Milling. Open it on the page or download the PDF Palantir will actually get.
Jeremy Panasuk
New Auburn, WI · 715-970-0204 · jpanasuk@gmail.com
Packet: https://jpanasuk-netizen.github.io/for-warp-speed/
Hiring team — Palantir Warp Speed
Forward Deployed Software Engineer · New York / Hybrid
You pioneered the FDSE title. I have been doing that work since Informatica parachuted me into burning platforms — from the factory floor to the boardroom — and left systems other people could run.
Warp Speed is the Manufacturing OS for American reindustrialization. My receipts are manufacturing: Dawn Foods warehouse loads 8 hours to under 1. Micron fab, 2,080 to 7,000 hours, zero downtime. Mercedes +200% on the longest workflows. Toyota Engine Management go-live, every consultant 5/5. Cargill oils plants — business analyst overseeing plant ERP implementation. Demantra, separate — demand planning; won Quarterly Award for Excellence, Oct 2006. Horizon Milling — time-dimension production visibility so accounting could see the floor, CFO Award 2005. PepsiCo, Ace Hardware, Kohl’s. The data was never prepared. The line did not wait.
I recovered 19 of 20 crisis accounts. I sat with senior VPs and a CEO when the architecture had to hold. The written operating path is public: Environment Summary, Upgrade Roadmap, Phase review — Farmers, Mercedes-Benz Financial, Northwestern Mutual, Waddell & Reed. Last two years I rebuilt on a private RTX 4070: measured GPU routing, production agents, bounded MCP. Same diagnostic playbook. New substrate.
U.S. person. Travel up to 25% is below the tempo I already lived. I will be where the line is. Python, SQL, production systems, customer rooms. I am not a new-grad puzzle profile. I am the operator who increases the pain threshold and still ships.
If you want someone who has already done FDSE in American plants, I am available.
Jeremy Panasuk